Crown Apartments, Mackay
Client: Polyseal Group
The entire building needed recladding – BFB Scaffolding were engaged to provide full perimeter scaffolding, undertaken in two stages.
- 3300m2 total project area
- 200 tonnes of equipment on site.
The building is located in CBD so some out of hours work was required to minimise disruption to surrounding businesses.
This entry was posted on .